TY - JOUR
T1 - A Foresight Study of Department of Bolivar towards 2033
AU - Acosta-Prado, Julio César
AU - Mojica Sastoque, Francisco José
AU - Salazar, Julio Hernando Linares
AU - Torres, Laura Ghisela Ortegon
PY - 2016/1/1
Y1 - 2016/1/1
N2 - This article is the result of a research project 'Bolivar 2033: A foresight study'. Its theoretical foundations are based on territorial foresight. Methodologically it was carried out in two stages: First, defining the state of the art, which included the analysis of the current situation and the study of technological surveillance and competitive intelligence. Second, through six workshops with stakeholders identifying change factors and prioritization of prevailing strategic variables for the future of the Department of Bolivar. As a result, eight possible future scenarios including a 'bet scenario' called 'Ave Fenix', plus 15 strategies selected for implementation were formulated.
AB - This article is the result of a research project 'Bolivar 2033: A foresight study'. Its theoretical foundations are based on territorial foresight. Methodologically it was carried out in two stages: First, defining the state of the art, which included the analysis of the current situation and the study of technological surveillance and competitive intelligence. Second, through six workshops with stakeholders identifying change factors and prioritization of prevailing strategic variables for the future of the Department of Bolivar. As a result, eight possible future scenarios including a 'bet scenario' called 'Ave Fenix', plus 15 strategies selected for implementation were formulated.
KW - Department of Bolivar
KW - scenarios
KW - strategy
KW - territorial foresight
KW - Department of Bolivar
KW - scenarios
KW - strategy
KW - territorial foresight
UR - https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84955576834&origin=inward
U2 - 10.1057/dev.2015.50
DO - 10.1057/dev.2015.50
M3 - Article in a journal
SN - 1011-6370
VL - 58
SP - 117
EP - 128
JO - Development (Basingstoke)
JF - Development (Basingstoke)
IS - 1
ER -